Black River Roads DRFA
|
|
|
Heavy formation grading incorporating 50mm and 75mm of imported material.
Three roads within the Black River region: Plumeria Road, Kataughal Road and Gieseman Road.
In total over 5km of road rehabilitation works. 2,700T Roadbase.
Three roads within the Black River region: Plumeria Road, Kataughal Road and Gieseman Road.
In total over 5km of road rehabilitation works. 2,700T Roadbase.