Bunnings Warehouse Superstore
|
|
Extensive carpark civil construction of 9,000m2.
Building pad preparation of 14,000m2.
Preparation of concrete roadways of 6,000m2. 1.5km of kerb placed.
10,000T of pavement material.
Extensive stormwater system installed.
Eco-friendly bio-retention basin.
Building pad preparation of 14,000m2.
Preparation of concrete roadways of 6,000m2. 1.5km of kerb placed.
10,000T of pavement material.
Extensive stormwater system installed.
Eco-friendly bio-retention basin.