Hervey Range Landfill - Cell A & C Capping
|
|
First project in Australia to use environmentally friendly bituminous geomembrane to ‘cap’ a landfill site.
Construction elements included:
Construction elements included:
- Subgrade preparation;
- Leachate interception trench and sump;
- Engineering fill placement to perimeter bunds;
- Subsurface HDPE drainage geocomposite;
- Perforated seepage pipe system;
- High strength / high flow panel drain;
- HDPE geonet strip drain;
- 300mm layer of imported cover soil; and
- 200mm layer of topsoil.