Jensen Landfill
|
|
Construction of the new Jensen Landfill.
- Installation of four sediment ponds and drains.
- Lined 10,000m2 leachate pond and leachate interception system.
- Works involved on site excavation for sediment ponds and filling of approximately 45,000m3.
- Construction of 1,300 perimeter bund.
- Top soiling and grassing 25,000m3.
- Construction of a 1,200m, 3-4m wide gravel access and turn-a-rounds.
- Sediment pond scour and overflow channels and low-flow pipe works.