Our projects |
Our experience working throughout North Queensland in the civil construction industry has provided us with a unique opportunity to adapt to project specific requirements.
Our ability to engage with all stakeholders regularly ensures any issues that arise are highlighted and overcome as quickly as possible without detriment to the project. |
Current projects
|
|
|
Extension to Bayswater Road to facilitate servicing of Precinct 6 within the Cosgrove Estate development.
Works comprise of construction of a roundabout, signalised intersection, and trunk watermain.
Works comprise of construction of a roundabout, signalised intersection, and trunk watermain.
|
|
|
Diversion Channels: Topsoil strip and cut 4,600m3 including a final turf layer of 16,540m2.
HES Basin and Dirty Water Drain: Excavation of 16,430m3. Line treatment of basin floor and wall area. Rock protection of varying thickness. Stormwater drainage with 1,200mm dia manhole with decants and frames. Premeable baffle fence and gates. Raise current sewer manhole, relocate current leachate pipe, relocate compressed air pipe. Construction of Access Road and Ramps to the Pond. Installation of turbid dosing system including electrical works.
HES Basin and Dirty Water Drain: Excavation of 16,430m3. Line treatment of basin floor and wall area. Rock protection of varying thickness. Stormwater drainage with 1,200mm dia manhole with decants and frames. Premeable baffle fence and gates. Raise current sewer manhole, relocate current leachate pipe, relocate compressed air pipe. Construction of Access Road and Ramps to the Pond. Installation of turbid dosing system including electrical works.
|
|
|
5Ha of clearing and grubbing to then excavate 33,203m3 to trim and compact cell floor. Construction of a groundwater de-pressurisation system using MEG300 panel strips. Installation of geosynthetic lining components. Installation of a Leachate Collection Pipework Network, drainage aggregate layer, separation geotextile layer, temporary UV protection layer and connection to the existing Cell 2.
Works also involved the construction of a sealed Access Road to the new Cells from the Transfer Station area.
Works also involved the construction of a sealed Access Road to the new Cells from the Transfer Station area.
|
|
|
Stages 3-6 include: Concrete Roadworks & Drainage (13,770m2 equaling 24,780m3 concrete pavements, 1.8km of drainage pipes); Sewer Reticulation (3km of sewer pipes); Water Reticulation (3.3km of water pipes).
Prior to this, Mendi was awarded the initial bulk earthworks component of this project, and was successful in being further awarded Stages 1-2.
Prior to this, Mendi was awarded the initial bulk earthworks component of this project, and was successful in being further awarded Stages 1-2.
|
|
|
Located on a 16.5Ha site at the Northern Beaches of Townsville Mendi were engaged to undertake the Civil Infrastructure works for the new Northern Beaches Retirement Village. To prepare the site for earthworks, 3 dwellings were required to be demolished and all materials removed from site.
- Earthworks required 43,895m3 of cut to fill on site.
- Roadworks consisted of concrete pavements totalling 6,830m2 (11,952m3).
- 1.6km of stormwater drainage pipes.
- 2.6km of water pipes.
- 1.6km of sewer pipes.
|
|
|
The first stages of construction of a $210 million over-50s development in the Harris Crossing Estate, by developer Living Gems.
Mendi was awarded the initial bulk earthworks component of the project involving the import of general fill (CBR 3 min -200mm screened) 156,162t.
Works moved on to include the Civil infrastructure component for Stages 1 & 2. This includes:
Mendi was awarded the initial bulk earthworks component of the project involving the import of general fill (CBR 3 min -200mm screened) 156,162t.
Works moved on to include the Civil infrastructure component for Stages 1 & 2. This includes:
- Concrete Roadworks & Drainage (9,964m2 equaling 17,000m3 concrete pavements, 1km of drainage pipes)
- Sewer Reticulation (1.2km of sewer pipes)
- Water Reticulation (2.7km of water pipes)
- External Sewer & Sewer Works (connect to existing)
|
|
|
The works consist of the construction of earthworks, roadworks, stormwater drainage, water reticulation, sewer reticulation and electrical and telecommunications ducting for the new 151 allotments.
Part of the work area is rock which required controlled blasting, Mendi was to manage the blasting crew. The blast material was to be crushed on site to 75mm minus and carted to future stages in Precinct 5.
Part of the work area is rock which required controlled blasting, Mendi was to manage the blasting crew. The blast material was to be crushed on site to 75mm minus and carted to future stages in Precinct 5.