Stuart Landfill - Cell 2C Interface Liner
|
|
The cell constructed was approximately 100m in length and on average 190m wide.
Scope of works involved preparation of subgrade, comprising stripping and grubbing the existing surface and shaping the existing surface where considered necessary to remove low spots or significant irregularities in the subgrade surface.
Over 40,000T of material imported to site.
Scope of works involved preparation of subgrade, comprising stripping and grubbing the existing surface and shaping the existing surface where considered necessary to remove low spots or significant irregularities in the subgrade surface.
Over 40,000T of material imported to site.