The Orchard Estate - Stage 3A
|
|
Residential subdivision offering homesite from 1,000 to 4,000m2. Earthworks including excavation and embankment construction; Stormwater drainage including kerb and gutter, and pipe and pits. Subsurface drainage; Retaining walls; Pavement consisting of subgrade preparation and replacement; Blasted material used as suitable fill material; Dilapidation inspections and reports completed on adjacent properties; Drilling and blasting involved techniques to control the impacts on adjacent properties