The Ville Driveway Reconstruction
|
|
The Saltwater carpark at The Ville is used as an overflow carpark, due to high vehicle movements on event days the driveway to the carpark was deteriorating, therefore requiring reconstruction.
Works commenced with re-line marking the carpark, prior to the excavation and removal of gravel and soil materials in the driveway.
The driveway was replaced with N40 concrete 180mm thick and poured in 2 sections so as to maintain access to the carpark. A replacement pathway and kerb ramp were also included in the scope, and the installation of a boom gate.